I am so incredibly lazy, I have the I-cord for Heather all made up, but it's in my knitting bag which is downstairs and the sweater is upstairs, I keep forgetting to bring it up and I'm not about to make a special trip. Maybe tomorrow.
I did finish my Magic Stripes socks. This is in the Jellybean color, which is the one color combo I really like in the Magic Stripe yarns. I have a thing for brightly colored socks, probably since my uniform is just so boring. I don't like the way the yarn has all the little misdyed blotches. Poor quality control.

I had to go buy another skein of yarn for the dog blanket. I'm almost out of number two, and it's nowhere near square. I know the dogs won't care, but it offends my sensibilities, so it's going to take a little longer than I thought to get them packed up and sent out. I have a third one planned, but I think I'm going to do a slightly smaller size so it won't be as overwhelming!
Zedd is helping me blog:

Current Reads:























